Context

Usually, offshore wind farms are connected to the land grid via offshore substations using regular bottom fixed structures. This technology would connect 62% of France’s potential. The remaining 38% represent a technical challenge. Floating offshore wind farms are installed in deeper waters that are too costly for bottom fixed substations.

A floating solution could be more relevant, in parallel with the development of dynamic cables supporting higher voltage levels than existing solutions. The latter are necessary for connection to turbines and to the network. The subsea substation also represents a plausible industrial alternative that has not yet been considered for high voltage connection.

Projet LISORE

Objective

  • To identify technological bottlenecks and potential solutions which will enable the reduction of the total cost of marine substations by 2025 for commercial floating wind farm projects

Main achivements

Technical feasibility study for floating or subsea substations adapted to offshore renewable energies

Feasibility study of the system and the associated maintenance plan

Economic evaluation of their global ownership cost

Identification of technological bottlenecks relating to the materials and processes required for innovative substations with a TRL below 5

Main outputs

  • Conceptual designs of electro-technical architectures and equipment for both submerged and floating substations
  • Pre-sizing of floating substation : topside, floater and mooring system
  • Methodology for unified electrical and structural time-variant reliability computation
  • Numerical tool for calculation of total cost of ownership of floating substations, including installation, maintenance and downtime costs
  • Database of failure rates estimation of the primary components of the substation
  • List of technological barriers and associated bottlenecks regarding critical components of floating and subsea substation

Conclusion

LISORE has investigated innovative solutions for electrical substation of offshore wind farms, anticipating the future of offshore renewable energy in deep waters, far from shore. The conducted work was set as a reliable methodology to study the reliability of the substation as a system, unifying electrical and naval structural disciplines. Pre-sizing of different concepts has been performed, and the corresponding total cost of ownership was calculated, including installation, maintenance and downtime costs. MOSISS which was launched following LISORE focuses on the modelling of the monitoring and maintenance strategies in reliability calculations, in order to optimize the maintenance of floating offshore substations.

Partners

This project was led by France Energies Marines and RTE.

Logo France Energies Marines
Logo RTE
Logo Atlantique Offshore Energy
Logo Comex
Logo EDF
Logo Innosea ABL Group
Logo Naval Energies
Logo Siemens
Logo SuperGrid Institute

Funding

This project received French State funding managed by the National Research Agency under the Investments for the Future Programme (ANR-10-IEED-0006-31).

Logo Investir l'Avenir

Accreditation

This project was certified by the maritime cluster Pôle Mer Méditerranée.

Logo Pôle Mer Méditerranée

Pour aller plus loin

Ajoutez votre titre ici

Lorem ipsum dolor sit amet, consectetur adipiscing ut elit tellus

Ajoutez votre titre ici

Lorem ipsum dolor sit amet, consectetur adipiscing ut elit tellus

Ajoutez votre titre ici

Lorem ipsum dolor sit amet, consectetur adipiscing ut elit tellus

Know more

Would you like to know more ?