Research & Development

Projet

HT-20MW

Electrical connection hub and application for a wind turbine for a 20 MW wind turbine

Context

France wants to position itself as the world’s leading manufacturer of floating wind turbines. To meet these ambitions, the industry needs to organise itself to offer more competitive solutions and develop its industrial facilities to produce locally and in series. Furthermore, extending the offshore interconnection grid is vital if the energy generated by floating wind turbines is to be fully exploited.

The first link in this grid is a high-power rotating electrical connection for machines that orient themselves into the wind. Mooring lines are also key components. While new materials are available, they do not yet have sufficient feedback to be deployed commercially on a large scale.

Projet HT-20MW

Objective

  • To design, test and certify a high-voltage rotating mechanical and electrical connection that is watertight and maintenance-free for 10 years

Scientific content

Parameterisation and coding of the behaviour of polyamide mooring lines in commercial software

Identification of failure modes for mooring lines and dynamic cables

Local and global numerical modelling of the dynamic cable, carrying out sea trials for in-service monitoring

Fatigue testing of dynamic cables and mechanical testing of mooring lines

Analysis of standards and certifications for mooring lines and electrical connections

Design and full-loading analysis of a 20 MW wind turbine

Design, manufacture and assembly of the mechanical and electrical parts of the rotating connection

Basin tests on a reduced-scale model of the 20 MW wind turbine

Expected results

  • Qualification of an in-service monitoring solution for dynamic cables
  • Qualification of external protection solutions for mooring lines and dynamic cables
  • Methodological note on fatigue and extreme loadings of mooring lines
  • Numerical model of a 20 MW wind turbine for fixed and floating applications
  • Design and demonstration of the wind turbine’s rotating connection

Conclusion

Lorem ipsum dolor sit amet consectetur.

Sagittis maecenas aliquam integer lobortis eu dignissim blandit tellus metus. Amet et tristique malesuada mattis pharetra bibendum purus id. Risus in elit ullamcorper ut. Imperdiet amet id feugiat arcu malesuada at ut vulputate condimentum.

Partners

This project is led by Eolink.

Logo Eolink
Logo Everaxis
Logo France Energies Marines
Logo Ifremer
Logo Université Gustave Eiffel
Logo Windglaz

Funding

The project is financially supported by ADEME, Corimer, BPI France and the France 2030 investment plan.

Logo ADEME 2020
Logo Corimer
Logo France 2030

Labellisation

Lorem ipsum dolor sit amet consectetur. Sagittis maecenas aliquam integer lobortis eu dignissim blandit tellus metus. Amet et tristique malesuada mattis pharetra bibendum purus id. Risus in elit ullamcorper ut. Imperdiet amet id feugiat arcu malesuada at ut vulputate condimentum.

Pour aller plus loin

Ajoutez votre titre ici

Lorem ipsum dolor sit amet, consectetur adipiscing ut elit tellus

Ajoutez votre titre ici

Lorem ipsum dolor sit amet, consectetur adipiscing ut elit tellus

Ajoutez votre titre ici

Lorem ipsum dolor sit amet, consectetur adipiscing ut elit tellus

Know more

Would you like to know more ?